9/8/2002

Previous page 2 of 2

DSCN1674 DSCN1675 DSCN1676
The stairs from the
landing up to the second floor
The stairs from
the first floor, up to
the landing
The west wall kitchen window
from the inside
DSCN1677 DSCN1678 DSCN1679
The west wall kitchen
window from the outside
The electric meter is
hooked up
I hope we remember to
put back the missing fence
section before we let Harley
out into the yard
DSCN1680 DSCN1681 DSCN1682
The blueprints call
for 6x6 columns, with
some architectural detail
at the top and bottom
If there were more
women on construction crews
perhaps the housekeeping
would be better
Is the gas meter going to stay this way?